Roofing in Manchester, New Hampshire

A roof in this part of the country has to handle snow sitting on it for months, ice damming at the eaves and wind coming off open ground. We do tear-offs and new asphalt roofs, and we pay attention to the two things that actually decide how long it lasts: how it is flashed and how it breathes.

Dark asphalt shingle roof with a decorative triangular gable truss and white trim
What is included

What the job actually covers

This is the scope we price. If something on your project falls outside it, we say so during the estimate rather than after.

  • Full tear-off down to the deck, with the sheathing inspected and replaced where it is soft
  • Ice and water shield at the eaves, valleys and around penetrations
  • Synthetic underlayment across the field
  • Architectural asphalt shingles
  • Step and counter flashing at walls, chimneys and dormers
  • Ridge vent and intake ventilation so the attic is not cooking the roof from below
Why us for this

Three things that change the outcome

  • Flashing is where roofs leak

    Almost never through the middle of a shingle. It is the wall junctions, the chimney and the valleys, and that is where the time goes.

  • We look at the attic

    A roof with no intake ventilation fails early no matter what shingle goes on it. We check before we quote.

  • The deck gets inspected

    Once the old roof is off we can see the sheathing. Anything soft gets replaced, and we show you before we cover it up.

Around here

Ice dams are a ventilation problem

When warm air escapes into the attic, it melts the snow on the roof from underneath. That water runs down to the cold eave, refreezes and builds a dam that pushes meltwater back up under the shingles. Adding shingles does not fix that. Ice and water shield at the eaves plus real intake and ridge ventilation does.

Get a free estimate
How it works

From your first message to the walkthrough

  1. 01

    Assessment

    We look at the roof, the eaves and the attic, and tell you whether you are looking at a repair or a replacement.

  2. 02

    Written estimate

    Scope, materials and what happens if we find bad sheathing underneath, so there is no surprise conversation on day two.

  3. 03

    Tear off and install

    Protect the grounds, strip it, inspect the deck, dry it in and shingle it. Site cleaned and magnet rolled at the end.

FAQ

Roofing questions

Can you go over the existing shingles?

It is sometimes allowed and we do not recommend it. You cannot inspect the sheathing under a layover, you cannot correct the flashing properly, and the extra weight and trapped heat shorten the life of what you just paid for.

How long does a roof take?

Most single family roofs around here are a matter of days rather than weeks, depending on size, pitch, complexity and weather. We will give you the window when we quote it and tell you early if weather moves it.

What happens if it rains partway through?

We only strip what we can dry in the same day. Anything opened up gets underlayment on it before we leave, so an overnight shower is not a problem.

Free estimate

Tell us what you are building

Two short steps. Fabricio handles the estimates, so you are talking to one of the two owners from the first message, not a call center.

  • We come out, measure and walk the job with you.
  • You get the number before anyone touches anything.
  • No charge for the visit or the estimate.

In a hurry? Text a photo of the space to (603) 000-0000 and we can start there.

1 The job
2 How to reach you

Inside